Looking Like Real Space Vs Construction Site

April 15th, 2008

The AV systems are starting to be installed, the bathrooms on the D2 level are just about completed and we are preparing for the finishes to be installed right after school lets out.  It is amazing how much carpet, paint, ceiling grid, ceiling tile, etc is used int eh project.  The light fixtures are starting to go into the new dining room area and it is actually beginning to look like a space that you can eat in versus a construction site.

Steve Wallner